The Puente del Estacio is already operational
01-08-2018
The Estacio bridge has recovered its usual opening hours since last night at 10pm. After 24 hours it was opened due to the breakdown of a part of the bridge's internal communication system. The City Council announced yesterday that it worked tirelessly to be able to advance the maximum restoration of service, scheduled for this morning at 08: 00h, and finally got in the night yesterday. Local Police and Civil Protection moved to the channel to coordinate the first pass of boats from one side of the canal to another, after a closed day, without any notable incidents. p>
Photogallery
downloads
- No downloads available
Last News
- El Fall Music Festival se suma al Otoño Cultural con una "Cajoneada" y tres conciertos dedicados al rock acústico, a Italia y Argentina
- El Certamen de Teatro Aficionado "Francisco Rubio", abre el plazo de inscripción hasta el 31 de octubre
- San Javier estrena una serie de soportes turísticos con información patrimonial, cultural e histórica
- El Ayuntamiento invierte 240.000 euros en mejoras y mantenimiento de los colegios del municipio durante el verano
- Abierto el plazo para la presentación de instancias a la convocatoria de 21 plazas de agente de policía local del Ayuntamiento de San Javier
- El Festival Acho Burger Land llega a San Javier del 4 al 7 de septiembre
- El Servicio de Urgencias y Emergencias 061 ha realizado más de 40.200 actuaciones en la zona de costa durante el verano
- El tradicional "English breakfast" inaugura un fin de semana festivo en Roda